19th December
Member Present
Wilfred Kok Jia Qiang
Mark Yuen Leen Jin (Secretariat)
Khant Kyaw Nyein
Sin Cheong Loong
Member Absent
Eugene Zhuang - Due to personal matters
Agenda
1) Blog/Website discussion
2) Prototype Programming
Minutes of meeting
- The meeting started with the discussion of the prototype coding by Cheong Loong and Kyant Nyein.
- Both programmers reviewed their coding to incorporate into the prototype
- As mentioned in the previous meeting, Kyant Nyein was to work on the DES algorithm part of the coding while Cheong Loong will be attending to the AES algorithm section
- After evaluation of the coding, the programmers have concluded to implement the coding into the prototype
- A graphical user interface has been created and deem as prototype0.1a.
- The programming team will implement the coding within this prototype GUI
- The website team has been working on the design and content of the website, we have decided to use wordpress to host our website.
- Roles were assigned to the production of the prototype,
- Cheong Loong will continue to work on the coding and algorithms.
- Mark Yuen will be in charge of the design and content of the website
- Kyaw Nyein will be assisting Mark in the production of the website
- Wilfred will be assisting Cheong Loong with the production of the GUI and implementation of the coding when required.
- With that, the meeting was adjourned and production was on it's way
- A second meeting will be arranged this week to discuss on certain events.
Vetted By Secretariat
Mark Yuen Leen Jin
Prototype 0.1a GUI
No comments:
Post a Comment