Here is a checklist on what has been done. as of 29/02/12

Documentation
  • Sequence diagram, use case diagram, class diagram are added accordingly to the technical documentation

  • Final check on the diagrams is performed

  • Updates on Test plans and requirement gatherings are to be completed by 1/03/2012

  • Grammar, appropriate format on the documentation as outlined by SIM is to be completed by the 1/3/2012.

  • Proposal to be updated to the current version (final product)

  • Project Diary to be updated till the presentation day.
Preparation for presentation

  • Presentation slide which had been completed by Mark Yuen have been reviewed

  • Several points are missing and is to be added by 1/3/2012 for a second review.

  • Topics have been assigned to each member of the group

  • Each member are in charge of their own speeches, if any points have to be noted , it will be updated in the slides.